LVVWD C-1088 Valley View Boulevard 2430 Zone South Pipeline Phase II

This project was done for the Las Vegas Valley Water District. The project was done under contract c-1088 Valley View Boulevard 2420 Zone South Pipeline Phase II.

The duration on this project was 380 calender days. The project consisted of the installation of 9,202 36 inch MLCP, 5,324 30 inch MLCP, five reinforced valve vaults with valves, fiber optic conduit with pullboxes, site preparation, restoration, pavement replacement, connections to existing pipelines and a 300 feet 54” jack and bore under Blue Diamond Rd. This project required a proper plan for excavation as the solid consisted of cemented sand and rock.

Acme Underground pre-trenched the project to insure the project would be completed on time. With careful planning and the right equipment acme underground was able to complete the project on time and within budget despite the hard ground encountered.

our utility clients

Nellis Air Force Base
Springs Preserve
College of Southern Nevada
Las Vegas Valley Water District