The duration of the project was 310 calendar days. The project consisted of the installation of approximately 10,770 linear feet of 36-inch MLCP, cast-in-place valve vaults, future connections, cathodic protection, air release valves, blow-offs and other appurtenances. This project involved special excavation thru caliche. In addition several deep lowerings where required at depths exceeding 25’ deep.
Special custom shoring was required to properly cross utilities and provide safe working areas for the employees.
With the proper equipment and good management the project was completed on time and on budget.