Equestrain Tributary Phase I

This project was done for the City of Henderson. The project was completed under contract 2009-004a Equestrian Tributary Phase I.

The duration of the contract was 210 calendar days. The project consisted of a regional planned flood control facility including a 2300 lf rectangular concrete channel, an energy dissipater, several maintenance access ramps and 750 lf of RCB (reinforced box culvert) ranging in size from 3 ft x 6ft to 4 ft x 11 ft. The work also consisted of various drop inlets, removal and relocation of utilities, one pre-fabricated steel pedestrian bridge and 4600 lf of 6 ft chain link fence with gates.

With local residents with 200 ft of the project Acme Underground worked very hard to have the smallest impact on the local residents. The project was carefully planned from start to finish. Acme Underground took special cautions due to this project being constructed during the monsoon season. As a result of a good management, the project was not impacted by several major rain events that hit the project.

The project was completed on time and within budget, with zero safety incidents and zero complaints by the public.

our utility clients

Nellis Air Force Base
Springs Preserve
College of Southern Nevada
Las Vegas Valley Water District